Friday, October 28, 2011

Parkside at Bella Casa, Phase 3 Public Hearing



The Parkside project continues to develop in the area of Milano Avenue and the Apex Nature Park. The proposed development is for 35 single family homes on approximately half of the total 19.5 acres located on Milano Avenue between Evans Road and Mt. Zion Church Road.

Planning Board Meeting: Monday, November 14, 2011 at 4:30 P.M.
Town Council Meeting: Tuesday, November 15, 2011 at 7:00 P.M.

The applicant has agreed to the following conditions: All residential buildings shall have exterior materials of brick, stone, wood and/or hardiplank siding. All roofs of residential buildings shall be pitched at 5:12 or greater and shall be covered with wood or asphalt shingles. Covered porches are required on the front façade of each single family residential structure facing the public right-of-way. All residential units shall require a crawl space or a minimum of two steps to the front door and 14 inches to the front door.